Jeff Mushell's shop made roughly 1,300 parts in a weekend with someone there for only about six of those 48 hours. Imagine walking in Monday morning, seeing a full bin of parts, and thinking, It worked. Until you remember somebody has to inspect every one of them.
We sat down with Jeff from PSA Systems on the floor at IMTS to hear what it took to get that first lights-out job running. Jeff got into machining because he wanted to know how BMX parts were made. Now he's the guy figuring out why a lathe can make good parts all day and still give you a mess to deal with in the morning. At one point, the biggest threat to the overnight run was what happened to the chips after they came off the conveyor.
That got us talking about what we've seen in our own shops. How much cycle time would you trade for a tool that lasts until morning? What happens when you make parts faster than your team can inspect them? And when you're walking the IMTS floor surrounded by robots and pallet systems, how do you figure out which jobs in your shop are actually ready for automation?
Jeff has a pretty simple answer for where he'd start if he had to do it all over again. It costs about a thousand bucks, and it'll teach you a lot about what your machine does the minute you walk away.