Fred Earnest of Vista Gold joins the podcast to walk through the newly refined feasibility study for the Mt Todd Gold Project in Australia. The report shows a smaller scale operation as previously reported, operating at a 15,000 tonnes per day operation. Using $2,500 per ounce gold price, project economics with the report show an After-Tax NPV (5%) of US$1.1 Billion with an After-Tax IRR of 27.8%